top of page

Carbon Reduction Plan

1. Baseline and Current Emissions (tCO₂e)

Asset 3.png
figure1.png

Figure 1:
Comparison of emissions across Scope 1, 2, and 3 for baseline and current years.

figure2.png

Figure 2:
Distribution of emissions by scope for the current year (2024–25)

Scope
Scope Description
2023–24 (Baseline)
2024–25 (Current)
Total
All scopes combined
202.1
184.0
Scope 3
Value chain emissions
179.1
165.0
Scope 2
Purchased electricity
15.0
12.0
Scope 1
Direct emissions
8.0
7.0

3. Targets and Trajectory

By 2030:

Scope 1 and 2 emissions reduced to zero

100% renewable electricity procurement

42% reduction in Scope 3 emissions

By 2040:

90% reduction in total market-based emissions

Residual emissions offset through verified schemes

2. Emissions Breakdown by Scope

Scope 1: Direct Emissions

Company-owned vehicle fuel consumption

On-site gas heating systems

Emergency generator fuel use

Scope 2: Purchased Electricity

Electricity consumption at Swansea and Bridgend sites

Power used for clinical equipment and IT infrastructure

Lighting, heating, and cooling systems

Scope 3: Indirect Value Chain Emissions

Purchased goods and services

Capital goods

Fuel and energy-related activities

Business travel

Upstream and downstream transportation and distribution

Employee commuting and homeworking

Operational waste and water usage

4. Reduction Measures by Scope

Scope 1:

Transition to electric vehicles

EV salary sacrifice scheme launched July 2025

Removal of gas heating systems at Bridgend

Low-emission maintenance equipment introduced

Scope 2: 

100% renewable electricity via Octopus Energy

Smart meters and energy monitoring systems

LED lighting and motion sensors

HVAC optimisation and insulation upgrades

Scope 3:

Supplier engagement on carbon reporting

Virtual meetings and remote working policies

Tracking of commuting and homeworking emissions

Expanded recycling and waste segregation

Water-saving fixtures installed

ISO14001 certification underway

5. Governance and Review

This plan has been reviewed and approved by the Sana Health Ltd Executive Team. It complies with Procurement Policy Note PPN 06/21 and follows the GHG Reporting Protocol and SECR requirements.

6. Declaration and Sign-Off

I confirm that the information contained within this Carbon Reduction Plan is accurate and has been reviewed and approved by the senior leadership of Clear View Surgical Ltd t/a Sana Health Ltd.

Signed:

sign.png

Ben Evans
Hospital Director
Clear View Surgical Ltd t/a Sana Health Ltd
Date: 25 September 2025

bottom of page